Project Introduction:
The project is located at No. 100, Science Avenue, Zhengzhou, Henan Province. It is an office building with a total area of ​​10,665 square meters and a total construction area of ​​13,500 square meters.
The total investment of the project: 28 million yuan.
Construction Unit: Zhengzhou University Postal address: No. 100, Science Avenue, Zhengzhou, Henan Province Postal Code: 450000
Contact: Zhu Fangzheng, 67783205
Design Unit: Comprehensive Design and Research Institute of Zhengzhou University Postal address: 50 Wenhua Road, Jinshui District, Zhengzhou, Henan Province Post code: 45002
Contact: Xu Jiqing (Deputy Chief Architect)
Phone, 63889838
Design Unit: Comprehensive Design and Research Institute of Zhengzhou University Postal address: 50 Wenhua Road, Jinshui District, Zhengzhou, Henan Province Post code: 45002
Contact person: Qin Jianming (water supply and drainage engineer)
Phone, 63889838
Anchoring parts refer to the components used to connect the overall refractory lining, refractory prefabricated parts, refractory fiber felt and furnace shell or furnace steel structure. The function of the anchor is to fix the connected lining in a certain position to resist static load, thermal stress, mechanical rotation or vibration. The anchors help prevent the material from collapsing before the ceramic bond forms during construction and heating. It also helps to uniformize the shrinkage of the material and avoid the formation of large, concentrated cracks in the lining.
Metallic Anchors,Metal Anchors,Ss Anchors,Alumina Anchors
Puyu kiln technology (jiangsu) CO.,LTD , https://www.anchorpy.com