2. Before the operation of the valve is started, it must be contacted with the pump station (the pump station should be specially managed) and slowly opened.
3. Operators are required to observe the allowable range of water (oil) press working pressure and are not allowed to work under overpressure or low pressure.
4. When the equipment starts to press, the person is not allowed to lean on the water (oil) press. The operator is not allowed to stand directly under the beam.
5. When pressing or correcting the workpiece, do not hold the workpiece by hand, and do not use an irregular temporary horn or other round rod for pressure pad correction.
6. Heating and heating, must be ventilated before ignition, to eliminate the accumulation of gas, to prevent explosion. Be sure to prevent flames from burning out when burned.
7. When pressing the workpiece, do not hold the workpiece and do not clean the scale. The loading and unloading of water (oil) presses, repairs and lubrication must be performed after parking. Retreat the indenter to a safe position and put the brakes on top to prevent accidents.
8. In the operation of the clamping cylinder switch, you must look at the indicator light, attention should be focused, and irrelevant personnel are not allowed to enter the console, so as not to hinder work and accidents.
9. No open fire or smoking is allowed near the fuel tanks, around the oil pump room and near the gas stoves. Flammable and explosive materials should leave the work site 5 to 10 meters.
10. When running the workpiece, the traffic should be directed by a special person, and should follow the safety procedures of the linked workers and work closely with the driver. The spreader B wire rope should meet the requirements to prevent the wire rope from falling off.
11. During operation, the used tires, molds, and workpiece backing plates, horns should be placed in the center of the indenter and flattened to avoid pressure collapse.
12. Start the equipment and the starter should contact the hydraulic press operator. The signal and meter instructions are clear.
13. The pipeline facilities and electrical equipment shall be repaired under the trench, and the operators shall cooperate with them and supervise them. Running lights should be powered using safe voltages.
14. Use a sledgehammer to correct the workpiece and follow the safety procedures for the fitter.
This product(concrete batching plant)mainly consists of 5 major systems such as mixer, material weighing system, material conveying system, material storage system and control system and other ancillary facilities.This product(concrete batching plant) is equipped with the storage, batching, conveying, stirring, control and other devices of various raw materials required for precast concrete, and various aggregates, powders, admixtures, water, etc. A complete set of equipment for supplying concrete in a concentrated manner than by a mixer.
Features of concrete batching plant:
1.The overall steel structure of the mixing station is made of high-quality steel, which has high overall structural strength and strong stability.
2.The mixing machine adopts the twin-shaft forced mixing main machine, which has strong mixing performance, uniform mixing and high productivity.
3.Excellent pneumatic components, electrical components, etc.; to ensure the reliability of the equipment, accurate metering performance.
4.Each maintenance and repair site is provided with a walking platform or a check ladder, and has sufficient operation space. Easy maintenance and repair
Advanced Concrete Batch Plant,Hopper Type Concrete Batching Plant,Mini Mix Concrete Batching Plant,Universal Concrete Batching Plants
Shandong Zeyu Heavy Industry Science and Technology Co.,Ltd. , https://www.sdjzcseriesdrumconcretemixer.com